Published - December 5, 2024 @ 10:01 AM
Alert: Landfill Gas Collection and Control Equipment Planned Down Time on 12/7/2024 at 8am
On Saturday, December 7, 2024, Chiquita plans to perform generator service, which may result in downtime of Flare 3 from approximately 8:00am to 12:00pm, for a total duration of up to 4 hours. Due to this downtime, there is a possibility of increased odors in the community during the indicated time period.
Under the new Condition 81 of the August 27, 2024 Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community (i) if any individual control device has downtime which is anticipated to last 30 minutes or more or once any downtime for an individual control device reaches 30 minutes of downtime or (ii) if the downtime of any combination of landfill gas collection equipment results or is planned to result in a reduction of gas flow to control devices by 10% or more and the downtime is anticipated to last 30 minutes or more or once any downtime for such devices reach 30 minutes of downtime.
Chiquita continues to work to diligently comply with regulator orders.